Tools & Guides
Missed Opportunities
Neglecting key opportunities
Scope of Opportunities
Weak description of scope of measures
Equipment and Project Life
Overestimated or omitted
Energy Savings Estimation
Overestimation of energy savings
Energy Savings Measure Selection
Selecting the wrong measure due to missing or incorrect information
Installation Costs
Installation costs underestimated or omitted
Building Description
Building components poorly described or missing entirely
Billing Analysis
Inadequate billing analysis for measures and projects
Life-cycle Costing
Failure to provide client with the "whole picture" afforded by Life-cycle costing
Inadequate Review
Obvious mistakes other than calculations






